Healthcare Construction Management

Managing risk while
the work gets done.

Healthcare construction in active facilities creates real infection risks. Oncore provides on-site ICRA management, particulate monitoring, and audit-ready documentation to protect patients and keep projects moving through every phase of construction.

ICRA 2.0Particulate MonitoringBarrier IntegrityASHEPre-ConstructionAudit Documentation
Services Include

Every phase covered,
from permit to punch list.

01
Pre-Construction Evaluation & Particulate Monitoring
Baseline environmental assessments before construction begins, establishing particulate benchmarks and identifying risks that must be addressed before work starts in or adjacent to patient care areas.
02
ICRA 2.0 Risk Classification & Permit Management
Complete ICRA 2.0 risk classification using the ASHE matrix, permit development, and ongoing permit management. Every project type and patient risk category covered, with documentation that satisfies JC and DNV surveyors.
03
Barrier Integrity Monitoring
Regular inspection and documentation of construction barriers throughout the project lifecycle. Barriers are checked for seal integrity, pressure relationships, and compliance with ICRA permit requirements.
04
Class IV & V Particulate Sampling
Active air sampling per ASHE ICRA 2.0 Toolkit protocols for the highest-risk construction zones. Results documented with chain-of-custody records ready for regulatory review.
05
Infection Control Risk Assessments
Formal ICRAs for all construction and renovation activity, developed by credentialed infection prevention professionals with direct knowledge of Joint Commission and CMS requirements.
06
Audit-Ready Documentation
Complete project documentation packages including ICRA permits, monitoring logs, barrier inspection records, and sampling data, organized and formatted for immediate review by surveyors or regulators.
Patient Safety First

The walls come down while patients keep healing, because the dust never reaches them.

Compliance Suite
Technology

Built-in tools for
every active project.

Oncore's Compliance Suite gives construction teams and infection preventionists the tools to manage ICRA permits, track barrier status, and document monitoring activity in one place. It's the operational backbone behind every Oncore construction engagement.

Explore the Compliance Suite →
IP
ICRATrack App
Mobile permit management and barrier inspection logging, accessible from the job site in real time.
PM
Particulate Monitoring Logs
Structured sampling records with time-stamps, location data, and threshold comparisons built in.
RX
Survey-Ready Reports
Documentation packages that can be pulled and presented to a surveyor the same day they walk in the door.
Who We Serve

Active facilities under
construction.

Any time construction happens in or adjacent to patient care, Oncore can provide the infection control oversight that protects patients, satisfies regulators, and keeps projects on schedule.

Hospitals managing tower additions or renovations
Surgery centers undergoing expansion
Cancer centers and specialty care facilities
Health systems with multi-site construction programs
General contractors working in healthcare environments
Facilities preparing for survey during active construction
Pre
Pre-Construction
Baseline particulate survey, ICRA risk classification, permit development, and barrier specification before any work begins.
Mid
Active Construction
Scheduled and unscheduled barrier inspections, ongoing particulate monitoring, permit updates for scope changes, and real-time issue resolution.
End
Project Closeout
Final documentation package compilation, clearance sampling where required, and survey-ready filing of all construction ICRA records.
Why Oncore

The clinical side of
every construction project.

01
IP Credentials Behind Every Hard Hat
Oncore’s construction oversight is led by infection prevention professionals, not general construction consultants. We know what regulators look for because we’ve sat through the same surveys our clients face.
02
ICRA 2.0 On Every Project
Correct permit types, risk matrix classifications, and particulate sampling frequencies for Class IV and V projects, implemented from the first day of work, not retrofitted mid-project.
03
No Scramble on Survey Day
Every record is formatted around surveyor expectations, filed by project phase, and retrievable the same day a surveyor walks through the door. Our clients don’t dig through boxes.

Breaking ground
in a hospital?

The earlier we’re involved, the cleaner the process. Bring Oncore in before permits are issued and we’ll set baselines, develop ICRA permits, and build the monitoring plan from day one.