Oncore Office Hours 2026

Monthly ICRA
Office Hours

Open conversations with the people doing the work. One-hour sessions hosted on a Friday each month, June through December. Robert Booth, MPH, CIH leads the discussion and the live Q&A.

When
One Friday a month
June to December 2026
Format
One hour · Zoom
Includes live Q&A
Cost
Free to attend
Open to everyone
See the full schedule ↓
Who Office Hours are for

Already trained, or just have questions?

Maybe you've already taken an ICRA class, or you don't need the full course, but you have questions about your specific project or your particular requirements. Maybe the ICRA form is tripping you up, or something just isn't clicking. Join us for our one-hour monthly Office Hours.

Every session is free and open to everyone, with live Q&A from your instructor, Robert Booth. Any and all ICRA-related questions and real-life project problems are welcome.

The Full Schedule

The 2026 Series

Each session stands on its own. Register for the dates that fit your projects, or join all seven across the year. Every session is free to attend. Reserve your seat and we'll email your Zoom link.

Next session
Friday, September 25, 2026

Ventilation Considerations During Healthcare Construction

Every containment is a temporary departure from how the hospital's air systems are meant to run. Someone has to decide how far that departure reaches and what it takes to put the building back.

A ventilation management program is the hospital's written plan for how its air systems are supposed to operate. It classifies spaces by risk, sets the conditions each one must hold, assigns responsibility, and defines what happens when a room falls out of range. ASHRAE and ASHE published Guideline 43 in 2025 to give facilities a framework for developing one. Many hospitals either have no VMP or have one that does not address construction. That gap matters for ICRA work. An ICRA covers a single project and closes when the project closes. The VMP is permanent and covers the entire building. Every project is a temporary, deliberate departure from the VMP, and someone has to determine how far that departure extends and what is required to restore the building afterward. Most of the difficulty involves air. An ICRA calls for negative pressure in the work zone. Holding that pressure requires air to physically leave the containment, and that air has to be replaced from somewhere in the building. Remove enough of it and you can reverse the pressure relationship in a room several doors away that appears nowhere on the permit. Failure to control ventilation systems has ranked among the most frequently cited higher-risk physical environment findings from both The Joint Commission and DNV for several years. We will reference Guideline 43 throughout and point attendees to it. Bring a current project. The second half of the session is open questions.

What we’ll cover
  • What creates negative pressure, and why a HEPA unit recirculating within the room does not
  • Exhaust routing and its practical limits, including duct length, discharge location, and separation from outdoor air intakes
  • Make-up air, and how a construction exhaust decision becomes a finding in an operating room or isolation room served by the same air handler
  • Monitoring and documentation during the project, both inside the zone and in surrounding spaces
  • Verification and records required before a space returns to service
Facilitator
Robert Booth, MPH, CIH
Format
One hour · Zoom
Free to attendOpen to everyone
Who you’ll learn from

Your facilitator

Robert Booth, MPH, CIH
Facilitator · All sessions

Robert Booth, MPH, CIH

Founder of Oncore Risk Management and co-author of the ICRA 2.0 standard. A practicing industrial hygienist and public health consultant, Robert facilitates every Office Hours session and leads the live Q&A.

Friday, October 23, 2026

Handling ICRA Projects When Environmental Hazards Are Discovered

Asbestos and mold do not always show up in pre-construction surveys. When they appear mid-project, the containment plan, schedule, and contract all have to flex at once.

What to do when a project uncovers asbestos, mold, or other regulated materials inside an active containment. Covers the handoff to abatement, how the containment scope and air strategy change, and how to keep ICRA documentation intact through the remediation phase. What to negotiate up front in the contract so a discovery does not stall the job.

What we’ll cover
  • The handoff to abatement when asbestos or mold appears mid-project
  • How containment scope and air strategy shift during remediation
  • Keeping ICRA documentation intact through the hazard phase
  • What to negotiate up front so a discovery does not stall the job
Guest speaker
Remediation Specialists
Facilitator
Robert Booth, MPH, CIH
Format
One hour · Zoom
Free to attendOpen to everyone
Friday, November 20, 2026

Particulate Monitoring and How to Set Up a Particulate Program

Particulate monitoring is moving from optional to expected on many ICRA projects. Most teams have not yet built a program that holds up to a real audit.

When to monitor, what to monitor for, and how to build a particulate program that holds up under scrutiny. Covers sensor placement, baseline readings, alarm thresholds, and how to use the data during a project rather than only after. Practical setup for both project-specific monitoring and longer-term in-house programs.

What we’ll cover
  • When to monitor, what to monitor for, and where to place sensors
  • Baseline readings and alarm thresholds that hold up to an audit
  • Using monitoring data during the project, not just after
  • Building both project-specific and in-house monitoring programs
Facilitator
Robert Booth, MPH, CIH
Format
One hour · Zoom
Free to attendOpen to everyone
Friday, December 18, 2026

Knowing When to Stop a Project and Decommission Properly

Knowing when to call it. How to decommission a containment cleanly when the work is done, and how to read the signs that get missed before a stop becomes mandatory.

How to decommission a containment without spreading contamination. Covers final clean, negative pressure release, barrier takedown sequence, and the documentation needed to close the project. The signs that get missed before a stop becomes mandatory.

What we’ll cover
  • A clean decommission sequence from final clean to barrier takedown
  • The documentation needed to close a project properly
  • Reading the early signs before a stop becomes mandatory
  • How to make and communicate a stop-work call
Facilitator
Robert Booth, MPH, CIH
Format
One hour · Zoom
Free to attendOpen to everyone

Past sessions

Missed a session or want to revisit a topic? Recorded Office Hours sessions are available below, free to watch.

Friday, June 26, 2026

Appropriate Barrier Selection and Setup

With Robert Booth (Oncore) and guest William Randall, STARC Systems.

Containment starts with the barrier. The wrong choice, or the right barrier installed poorly, undermines every other ICRA control downstream.

Watch the session →
Friday, July 24, 2026

Negative Air Challenges and Proper Placement

With Robert Booth (Oncore) and guest Josh Skinner, Omni CleanAir.

Negative pressure is the control most teams say they have and most teams struggle to actually hold. This session looks at why.

Watch the session →
Friday, August 21, 2026

Entrance Management for Healthcare Construction

With Robert Booth (Oncore) and guest RE-U-ZIP.

The entry point carries more traffic than any other part of a containment barrier and is a frequent source of breaches. This session examines its design, maintenance, and failure modes.

Recording coming soon

Bring your toughest ICRA questions.

Office Hours are built for the field. Whether you run containment, manage facilities, or sit on the infection control side, you’ll leave each session with something you can use on the next job.

See all training